Installing new floor joists


















Floor joists are installed early in the building process, and this work is typically done by the framing carpenter since it is part of the structure of the home. Install the wooden block by hammering down a couple of nails on both sides to attach it to the two parallel joists. There are multiple types of bridging that are effecting with joists. I have found this metal nailless bridging that looks promising but i'm not exactly sure how to install it?

Also, ensure the bottom of the block is flush with the joist. Then measure the span of the joists the distance between walls or beams that support the joists. Removing floor joist cross bracing is never a good idea unless they are replace by another brace such as strapping.

To install the type shown here, drive the toothed end into the joist and nail the other end. The bridging helps prevent joists from twisting when they're loaded. A floor that just has joists, and no bridging, will wear out faster from heavy traffic. Approximate length of joist span from outside wall to beam 3. If there is no bridging in the center of the span, install a row there as well. Meanwhile, for bridging, i often use metal floor joists to bridge over your old wood blocking for longer floor joists.

Install blocking between a pair of ceiling joists to hang a heavy object between them. Once a foundation is poured, the framing contractor goes to work building the skeleton of the building, part of which is the flooring area. Use 6d or 8d nails for bridging.

It says it can be installed before or after sub. Screw a hook into the block to hang a plant or other heavy object. Floor joist bridging is critical to the structural strength of a floor, as shown in figure 1. Even if these are correct, then, i will replace them, but put them in with adhesive and screws. A floor with bridging is also little less bouncy when. How to find floor joists under hardwood. Then use a swinging saw and pry bars to pry and cut out the floor joist away from the subfloor and use the back end of a hammer or crowbar to open the gap between the subfloor and floor joist.

Costs will vary widely depending on the extent and nature of the original problem. Work your way across the span of the joist, prying it free from the subfloor. Galvanized drywall screws to supply a solid, flat nailing surface. Remove nails and debris from the subfloor if necessary. Before you replace damaged floor joists, you must exterminate the insects or improve the drainage and ventilation so the problem won't reoccur.

The replacement subfloor should be attached using new nails. Pry the damaged joist from the subfloor using a crowbar or other pry bar, hammering wedges of wood between the subfloor and joist along the way to make your work easier.

Remove, replace and plaster the ceiling. The first alternative would be to use a hammer or a magnet to locate the floor joists underneath the subfloor. Replacing the subfloor 1 in a sq. Unlike joists, floor trusses are not solid members than can be easily replaced. This article will assume 16" o. Start at one corner of the foundation and layout the joists 16" o. If you hook your tape measure on the sill plate that runs parallel to the joist layout then you will find 16" on the tape measure and subtract half the thickness of the joist to mark the edge of the floor joist.

So for a 2" wide flange on a joist you will find 16" on the tape measure and go back to 15" to make the mark. Continue this on all the marks along the sill plate.

Mark the opposite sill plate from the same end so all the floor joists are square with the foundation. Use a ladder to mark the top of the bearing wall with the same joist layout from the same side of the foundation as the two exterior walls.

The rim joist is attached at the ends of the joists to keep the joists stable in the upright position and to carry the weight of the walls and roof above. The rim joist will typically sit on the edge of the sill plate. If there is a stairway opening you will frame the walls for it just like you did the main bearing wall.

The floor joists will run to the inside of the stairway and be headed off with a rim joist on the inside side of the stairway. Stairway opening in floor joists. Notice how the rim joist sits on the inside of the stairwell wall so the floor joists can bear on the wall.

The two joists at the top of the stairs provide additional support to hold the stair stringers. Sometimes you may want to have a beam holding the floor but you don't want the beam to be below the floor joists.

This problem can be solved by installing a beam in the floor joist system and hanging the floor joists on the beam. Make sure to use construction adhesive in the seat of the hanger to prevent floor squeaks. Other times you can simply put the beam under the floor joist.

This beam will get trimmers under each end to hold it up before the framing is finished. Cantilevers are used to extend the floor beyond the foundation. This is popular with fireplaces, breakfast nooks and bay windows. Follow the engineering specifications when determining how far the joists need to extend under the floor to allow your desired cantiliever.

The final step in building a floor for a house is to sheet it with OSB. The OSB or plywood must be staggered like stacking bricks to give it strength. Pick a wall to start installing the floor sheeting from, typically you will start at the same end that you laid out the floor joists from so you can start with a full or half sheet.

This is the floor sheeting around the stairwell. Notice how the rim board and the sheeting and the wall below line up perfectly. Also notice how we left the sheeting over hanging the first step so there will be a stair nosing coming off the floor. Wait until the stairs are in to cut out the sheeting over the bottom part of the stairs to make sure there is the code required 6'-8" of headroom. Reply 1 year ago.

I take it you are referencing the stair stringer supports they used? Looks similar but isnt and is way stronger than OSB or your standard pine. Now the sill anchor positioning on most of the walls is in violation.

That and the use of a 2 x 4 sill and no fire blocking or bracing on the load bearing walls had me shaking my head. Question 1 year ago on Step 2. What state are you in that the inspector would allow for a 2x4 Sill plate and a toe nailed and notched the rim joist like that?

Reply 5 years ago. In a country where you have lots of tornados I don't understand why you keep building fragile wood houses.

Iron and concrete is far more secure, will last a lifetime, and you will survive to bad weather! Here in "Tornado Alley" you see newer houses demolished by tornadoes while the houses that were built fifty plus years ago survive at a much higher rate.

The older houses were built to higher standards. You see a lot of them that were built with 2x6 roof and ceiling trusses and 2x6 wall studs instead of the cheap white pine 2x4's used today. Pine was seldom used in the construction of these older homes.

I have been in two tornadoes here that have sucked up roads. After one, I was wondering what all of the holes in the ground were then I realized that they were where the fence and power poles had been. It sucked some poles right out of the ground and others were snapped between ground level and six feet. Another tornado hit a farm implement store and was whirling multi-ton tractors in a circle with over a quarter mile radius even damaging railroad track.

I saw concrete structures obliterated. However, weak wood houses that had some give between the gusts were better able to handle the gusts. Lately though, the big threat is the following rain. You can't survive an EF 5 unless you are in a hole.